This standard was last reviewed and confirmed in 2018.
Therefore this version remains current.
Abstract
PreviewISO 29481-2:2012 specifies a methodology and format for describing ?coordination acts' between actors in a building construction project during all life cycle stages.
It therefore specifies
- a methodology that describes an interaction framework,
- an appropriate way to map responsibilities and interactions that provides a process context for information flow,
- a format in which the interaction framework should be specified.
ISO 29481-2:2012 is intended to facilitate interoperability between software applications used in the construction process, to promote digital collaboration between actors in the building construction process, and to provide a basis for accurate, reliable, repeatable, and high-quality information exchange.
-
Status: PublishedPublication date: 2012-12
-
Edition: 1Number of pages: 74
-
Technical Committee: ISO/TC 59/SC 13 Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM)
Buy this standard
en
Format | Language | |
---|---|---|
std 1 187 | PDF + ePub | |
std 2 187 | Paper | |
std 3 187 |
- CHF187
Life cycle
Got a question?
Check out our FAQs
Customer care
+41 22 749 08 88
Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)